Monthly Archives: March 2019

Sidewalk Master Plan

Here is our map of existing sidewalks (in black) and proposed sidewalks for the future (in red).  Currently we are focused on getting the sidewalk along Boynton Drive coming into Alabama Highway.  This has required many easements and engineering to scale the incline and get over the spillway at the bottom of the hill.  For safety, this is the most needed sidewalk in our community right now.  The amount of people walking into town from the multi family units along that corridor is substantial, and they are in need of a safer way to make that trek.

Click the link for a view that you can zoom in and out.

Sidewalk existing and proposed Master Plan 2019 (1)

Leave a comment

Filed under Uncategorized